List what you run, and this works out your connected load, your likely maximum demand, a
generator size that will start your largest motor, and the minimum cable size for a run.
Built by engineers who size these systems for a living.
Most Nigerian industrial sites are 415 V three-phase. Small shops and offices are single phase.
2. What you run
Add each load. For motors, enter the shaft rating on the nameplate — the tool
adds efficiency and power factor to get the electrical load. Diversity is the share of
the time it actually runs: a compressor that runs constantly is 100, standby plant is 0.
Description
Type
kW each
Qty
PF
Eff %
Diversity %
kVA
Result
0Connected kW
0Connected kVA
0Maximum demand kVA
0Generator kVA
Add some loads above and the numbers will fill in.
3. Cable size for a run
You can use this on its own — section 2 is not needed. Enter what this one
cable feeds, not the whole site. It uses the supply you chose in section 1.
—Design current A
—Min. copper mm²
—Actual volt drop
Enter the rating of the load this cable feeds.
Read this before you buy anything. This tool checks volt drop only. A cable must
also carry its current safely for the way it is installed — buried, in trunking, in free air,
bunched with others, and at Nigerian ambient temperatures — and it must work with the protective
device in front of it. Those checks need the installation conditions and the relevant standard.
Generator sizing here assumes direct-on-line starting of the largest motor; a soft starter or
VFD changes it substantially. Treat these numbers as a first estimate to plan and budget
with, not as a design. Send them to us and an engineer will confirm them properly — that
part is free.